An engineer looks at the Bridge failure

Tony Alfrey: “Everyone was in a big rush to open the bridge after Labor Day weekend, so some ‘repairs’ were made, but not much detail was available as to what was actually done.  On the evening of Oct. 27, in the middle of rush hour, the repair broke.  Let’s see what this is all about…”

bridgeCrack

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s